Construction History
Classified Dossier
This report records the history of a planetary facility forming part of the Utopia Project. Several sections are curiously absent.
DS 2368 :: Facility founded. Plasma deep drill rig operational.
DS 2384 :: Return growth steady at 1%.
DS 2400 :: Overseers querying growth rate.
DS 2416 :: Orbital exp. approved. Station trade booming.
DS 2432 :: [Redacted] hazard encountered.
DS 2448 :: [Redacted]
DS 2464 :: Utopia Project launched.
DS 2464 :: Facility restored. Plasma deep drill rig operational. Trade routes re-opened.
DS 2480 :: [Redacted]
DS 2496 :: Facility restored. Plasma deep drill rig operational. Trade routes re-opened.
DS 2512 :: [Redacted]
The last two entries are repeated over and over, across hundreds of pages.
This report records the history of a planetary facility forming part of the Utopia Project. Several sections are curiously absent.
DS 2368 :: Facility founded. Plasma deep drill rig operational.
DS 2384 :: Return growth steady at 1%.
DS 2400 :: Overseers querying growth rate.
DS 2416 :: Orbital exp. approved. Station trade booming.
DS 2432 :: [Redacted] hazard encountered.
DS 2448 :: [Redacted]
DS 2464 :: Utopia Project launched.
DS 2464 :: Facility restored. Plasma deep drill rig operational. Trade routes re-opened.
DS 2480 :: [Redacted]
DS 2496 :: Facility restored. Plasma deep drill rig operational. Trade routes re-opened.
DS 2512 :: [Redacted]
The last two entries are repeated over and over, across hundreds of pages.
Economy
| Low | 14.4 |
| High | 17.6 |
| Buy | 19.2 |
Recipes to create Construction History | Recipes Construction History is used in |